2010 10 18 – 2010 10 19

On the 18th we were told which sites we designed will actually be built. Out of the 5 designs we will be building the gateway, reconciliation garden, exhibition/corridor space, courtyard, and a mural will be painted on one of the secondary dormitory building facades.

We then chose which CAD plans and details we want to work on. I was in the groups working on the reconciliation garden layout plan, all of the planting plans, paving details, and consolidating all of the documents into one packet. With varying levels of efficiency in CAD and only a few laptops with CAD on them, drafting all of these documents in two days kept us fairly busy.

Advertisements